Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2023-09-11 23:48:15
Size: 1653
Comment: added some agenda items, add more!
Revision 6 as of 2023-09-13 17:45:20
Size: 1986
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''Location:''' NodeBuffaloGap '''Location:''' NodeBuffaloGap<<BR>>
'''Date and Time:''' Wednesday, September 13, 2023, 6:30pm-8:00pm<<BR>>
'''Scribe:''' You<<BR>>
'''Roll Call:''' JasonBergstrom,RussellSenior,MatthewKlug<<BR>>

'''Agenda'''
Line 6: Line 12:
  * NodeEcotrust -- PoE injector for downstairs AP seems to be dead, Jason stopped by to check.
Line 7: Line 14:
 * Saturday afternoon SkyPilot take-apart party ended successfully, with the last 12 SkyPilots dismantled:  * Saturday afternoon SkyPilot take-apart party ended successfully (Thanks JasonBergstrom, SteveTree and JonArmani!), with the last 12 SkyPilots dismantled:
Line 20: Line 27:
  and other boxes from the garage were emptied and on Monday, scrap metal was taken to Metro Metals, expect a check for $74 in the next few days. There are still a few unopened boxes in the garage with street light power taps (and ??).  and other boxes from the garage were emptied and on Monday, scrap metal was taken to Metro Metals, expect a check for $74 in the next few days. There are still a few unopened boxes in the garage with street light power taps (and ??).

Location: NodeBuffaloGap
Date and Time: Wednesday, September 13, 2023, 6:30pm-8:00pm
Scribe: You
Roll Call: JasonBergstrom,RussellSenior,MatthewKlug

Agenda

  • Pick location for next weekly
  • Install a new AP (ap6) at NodeBuffaloGap, reconfigure the switch to trunk the run to the new AP.

  • Node notes:
    • NodeBuffaloGap -- all the existing 5 MR24s were updated

    • NodeEcotrust -- PoE injector for downstairs AP seems to be dead, Jason stopped by to check.

    • NodeLuckyLab -- MatthewKlug reported his chromebook had some trouble with the captive portal, Russell rebooted it.

  • Saturday afternoon SkyPilot take-apart party ended successfully (Thanks JasonBergstrom, SteveTree and JonArmani!), with the last 12 SkyPilots dismantled:

    and other boxes from the garage were emptied and on Monday, scrap metal was taken to Metro Metals, expect a check for $74 in the next few days. There are still a few unopened boxes in the garage with street light power taps (and ??).
  • ARPA Grant update:
    • Russell drafted a requirements doc for FreeGeek for the preparation we'd like the interns to have

    • Russell will have visited the Floyd's building by meeting time, should have a better idea (with pics) of what will be needed there.
  • Your Item Here

Notes

  • None Yet


[CategoryMeetingNotes]

WeeklyMeeting20230913 (last edited 2023-09-13 20:05:42 by JasonBergstrom)