Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2003-01-06 23:22:35
Size: 1067
Editor: anonymous
Comment: missing edit-log entry for this revision
Revision 3 as of 2005-03-16 08:17:23
Size: 1067
Editor: WikiMinion
Comment:
No differences found!

PlayDayAgenda: Meet, Greet, Plan, Deploy, Test, and then Play.

Noon - 1 pm: Meet & Greet

  • Bring equipment to house / porch / backyard / garage (Hopefully it's not raining!)
  • Get stickers & tags for personal equipment - pop 'em on

  • Get name tag - pop it on :-)

  • Drop any foodstuffs(tm) into the kitchen & back pantry area

1 pm - 2 pm: Plan

  • Propose testing plan
  • Describe what you want to do and how you need to do it (if you know)

2 pm -3 pm: Deploy

  • Set up tables, extension cords, power switches, IP Address, network topology
  • Load software on client computers
  • Load applications on client computers
  • Test (ping, etc..) communication links
  • Erect all towers & infrastructure

3 pm -6 pm: Test

  • Whole group large network testing
  • Network degrade as clients get added

3 pm - 8 pm: Play

  • AdHoc network testing

  • Point - to - Multipoint testing of WAP11's
  • Range testing of AccessPoints and antennas

  • Drive around neighborhood to test range

PlayDayAgendaOne (last edited 2007-11-23 18:02:15 by localhost)