Differences between revisions 12 and 13
Revision 12 as of 2017-09-27 20:02:06
Size: 2796
Comment:
Revision 13 as of 2017-09-27 20:05:31
Size: 2860
Comment:
Deletions are marked like this. Additions are marked like this.
Line 27: Line 27:
 * Most are out for the October 18th, we will cancel that week

Location: NodeLuckyLab
Date and Time: Wednesday, September 27, 2017, 6:30-8:00 p.m.
Scribe: You
Roll Call: RussellSenior,TedBrunner,JasonBergstrom,TomasKuchta,DonPark

Agenda

  • Node notes:
    • NodeBeulahLand -- JasonBergstrom and RussellSenior got over to the node on Saturday morning and fixed the ethernet run between the Alix and the SkyPilot SkyGateway on the roof. Pins 4 and 5 (the blue pair, carrying +24V) lacked continuity. No visible damage to the cable. Tried recrimping one of the ends first, with no luck. Ended up using the last of our old spool of cat6 with a couple feet to spare for slack. Back in business. Repair took about 2 hours.

    • NodeEdison -- Wlanparts order had been unceremoniously canceled, with no notice, afaict. Ordered a single NSM2 from Amazon (free 2-day shipping), to assess viability of reflashing in the context of recent firmware-replacement-thwarting behavior. If successful, we will order another NSM2 and an NSM5 for the outdoor part of the node. Still waiting for the upstream to be installed before installing the indoor part. Upstream is currently identified as Stephouse. Target install date is October 26. Charlie would like our gear installed before Oct 20, as he's going to be out of town.

    • NodeWeidler -- have an issue where one of the APs is powered up, but disconnected from ethernet, so people connecting to www.personaltelco.net or VZAHomes might connect to the disconnected AP. Russell stopped by to investigate, it is the AP in their office, temporarily disabled the generic SSIDs to avoid the problem until staff can get into the office and correct the ethernet problem, hopefully tomorrow.

    • NodePioneerSquare -- the clock is still ticking on SRG's move-out. Need to find a replacement host to continue service there.

  • Pick a location for the next weekly meeting.
  • <add your item>

Notes

  • Node notes:
    • NodeEdison -- Russell received one NS-M2 via Amazon Prime, has not yet tested flashing

      • Stephouse install date October 26, Carl leaves town on the 20th
      • discussion about TPLink outdoor router - RussellSenior has ordered one

      • Install NanoStations at floor-level of second floor - 12' ladder should cover

      • Proposed install date of October 14th.
    • NodeWeidler -- Office NanoStation, possibly unplugged at the office end

      • RussellSenior - AP in office reconfigured to not broadcast personaltelco.net/vzahomes SSID

    • NodePioneerSquare -- RussellSenior will look into BoardMeeting date - 11:30am last Tuesday of the month

    • NodeLuckyLab -- No issues observed. If this is an issue with the PoS, contact RussellSenior directly for IT support

  • Comparison of Chuwi laptops
  • Most are out for the October 18th, we will cancel that week


[CategoryMeetingNotes]

MeetingSeptember2017 (last edited 2017-09-27 21:17:21 by JasonBergstrom)